Yiliang Jinzhu Cement 2500t/d×2 Clinker Production Line WHR Project
Date:2013-07-22
This
project owns 2*2500t/d cement clinker production lines. And the both lines are
equipped with WHR units. They are designed with 4 boilers and 1 turbine. The
turbine& generator’s installed power capacity 10MW.
This project’s construction period is about 9 months. And it is started on 15th
July. On 1st March, and connected to the grid on 6th July. The project passes
the performance test on 19th July, 2013.