国产精品无码怀孕_欧美日韩中文无限码_国产观看免费在线久_小可爱资源影视在线观看_一二三四免费影院_午夜不卡毛片免费_国产日韩欧美激情视频在线观看_在线观看av片无码永久免费_欧美成AⅤ人高清_網友分享国产视频第二页心得

Position:Dynamic news > Project News

Project News

Pakistan's BCL-KK project is successfully synchronized for power generation.

Date:2020-08-19

At 1:48 a.m. local time on December 25, 2016 in Pakistan, The BESTWAY KALLAR KAHAR (BCL-KK) waste heat recovery (WHR) project contracted by Shanghai Triumph Energy Conservation Engineering Co. Ltd (STEC) in Pakistan was successfully synchronized for power generation.

BESTWAY Cement Group is the largest cement group in Pakistan.KALLAR KAHARas BESTWAY affiliated cement plant invest a 12MW WHR project forits7000t / d cement clinker production line. Since the signing of the contract, under the strong support and great attention of the company leaders, all departments cooperate with each other, and all the staff work together to create good conditions for the project. The total construction period of project has taken 16 months since the signing of the contract, which is not only more than one month ahead of the construction period stipulated in the contract, but also the shortest cement WHR project in Pakistan, which is highly appraised and appreciated by BESTWAY cement.